Latest post Thu, Nov 29 2018 10:14 PM by Kevin Klimek. 2 replies.
Page 1 of 1 (3 items)
Sort Posts: Previous Next
  • Tue, Nov 27 2018 3:37 PM

    • smithek
    • Not Ranked
    • Joined on Fri, Oct 12 2018
    • Posts 6
    • Points 80

    Workflow: Ingest 59.94 Footage into 23.976 Project as Slow Motion

    Writing this post as I could not find a laid out workflow anywhere for ingesting/importing overcranked 59.94 footage into a 23.98 Avid project as slow motion.

    Please comment if you have any adjustments or tips!

    Using MC 8.8.5

     

    1) AMA Link the 59.94 footage. Right click > Source Settings > Playback Rates: Choose Playback Frame Rate: "Project's FPS (23.976)" [NOT "Clip's FPS (59.940)"]

    2) Right Click > Consolidate/Transcode > Transcode > Choose "Convert to project frame rate" [NOT "Keep source's frame rate"]

    3) Transcoded/imported clip now plays back in slow motion!

    MC 8.8.5 / OS X 10.14 / iMac Pro (2017) / 3.2 GHz 8 core Intel Xeon W / 64 GB 2666 MHz DDR4 / Radeon Pro Vega 64 16368 MB / RN using G-Drive 0G05024 with... [view my complete system specs]
  • Thu, Nov 29 2018 10:14 PM In reply to

    Re: Workflow: Ingest 59.94 Footage into 23.976 Project as Slow Motion

    AMA link the clips into your 23.98 project. Go to source settings for the clip. go to the playback rate tab. change from clip to project fps and your 59.94 will play frame for frame at 23.98

    HP Z840 3.1GHZ 20cores 128GB RAM M4000 GPU 1TB NVMe drive HP Z book 17 G2 2.7GHZ Quad core 32GB RAM Nvidia K3100M 1TB SSD drive ACI Moderator. I'm... [view my complete system specs]

     

    Broadcast & Post Production Consultant / Trainer  Avid Certified Instructor VET (Retired Early 2022)

     

    Still offering training and support for: QC/QAR Training - Understanding Digital Media - Advanced Files * Compression - Avid Ingest - PSE fixing courses and more.

    Mainly delivered remotely via zoom but onsite possible.

     

    T 07581 201248 | E [email protected]

     

  • Thu, Nov 29 2018 10:14 PM In reply to

    Re: Workflow: Ingest 59.94 Footage into 23.976 Project as Slow Motion

    You can also just change the playback rate source setting of the transcoded clip, instead of the linked one, after you ingest.

    Symphony v2019 | OS 10.13.6 • Nitris DX • 12-core MacPro (Mid 2012) • 36 GB RAM • Facilis Terrablock 24EX [view my complete system specs]

    -- Kevin

Page 1 of 1 (3 items)

© Copyright 2011 Avid Technology, Inc.  Terms of Use |  Privacy Policy |  Site Map |  Find a Reseller