Search

Page 1 of 1 (2 items)
  • Workflow for Speeding up slow motion dailies

    I am working on a documentary that shot a series of recreations on the Sony F55 at various frame rates up to 180fps. I have strung out the dailies and want a way to globaly remap the time to something close to a normal non-slow motion playback without trimming the durration of each shot manually. I need these sequences so the producers can screen the
    Posted to Avid Media Composer - PC (Forum) by Joe Fenstermaker on Sat, Mar 28 2015
  • Issues Grouping Clips shot at 23.98 edited in 59.94

    I am AE on a series shooting at 23.98 and delivering at 59.94 for TV. BACKGROUND In prepartation for the edit I am loading footage in a 23.98 project and then opening the bins in the 59.94 project and saving the clips into 59.94 bins. We want to edit in the 59.94 project rather then the 23.98 load project so that all the timing remains consistent to
    Posted to Avid Media Composer - Mac (Forum) by Joe Fenstermaker on Thu, Jun 27 2013
Page 1 of 1 (2 items)

© Copyright 2011 Avid Technology, Inc.  Terms of Use |  Privacy Policy |  Site Map |  Find a Reseller